The wind project, located adjacent to two existing wind projects, will be built, owned and operated by NextEra Energy Resources. The project will have up to 68 turbines, each with a generating capacity of up to 1.6 MW, and is planned to be operational by the end of the year.
This will be the sixth wind project partnership between the two organizations.
SOURCE: Basin Electric Power Cooperative Â