Irvine, Calif.-based DeWind Co. has shipped 10 2 MW wind turbines for installation at the site of the 20 MW Frisco Wind Farm, located in Hansford County, Texas.
The company says its D8.2 turbines are being furnished from DeWind assembly contractor TECO-Westinghouse, located in Round Rock, Texas.
The turbine's designs are grid-friendly and support capability to all grid situations, DeWind adds.