PALM Quick Connection System for Floating Offshore Passes Demo Testing

0

Apollo’s PALM Quick Connection System (QCS) for floating offshore renewables has passed demonstration testing.

Developed through the Wave Energy Scotland Quick Connection Systems program with support from the Offshore Wind Growth Partnership, the QCS is a mechanical system that can incorporate electrical wet mate connectors. 

It is designed to streamline the hook-up and disconnection of cables and moorings for floating offshore devices by enabling connections via the winching action of a conventional tow tug. 


Trials took place between March and May this year in Orkney, Scotland, demonstrating system capabilities in real-sea conditions.

“We are grateful to Wave Energy Scotland, through which the PALM QCS was conceived and developed,” says Nigel Robinson, Apollo’s Offshore Renewables director.

“Their ongoing support is vital to our success. Equally, our thanks go to Leask Marine, who were essential as our marine contractor, and to the numerous local supply chain companies whose contributions were crucial. This trial showcases what we can achieve together to advance the future of offshore renewable energy, and we look forward to continuing these collaborative efforts in the future.”

Subscribe
Notify of
guest
0 Comments
newest
oldest most voted
Inline Feedbacks
View all comments