Aker Solutions Gets Green Light at Norfolk Vanguard West Offshore Wind

0

Aker Solutions has been awarded a limited notice to proceed contract from Vattenfall for the Norfolk Vanguard West Offshore Wind Farm off the coast of Norfolk, U.K.

Located more than 47 km from the coast and with an installed capacity of 1.4 GW, Norfolk Vanguard West will be the first phase of Vattenfall’s Norfolk Offshore Wind Zone, which also includes the Norfolk Vanguard East and Norfolk Boreas developments. Once complete, the Norfolk Offshore Wind Zone will produce enough renewable electricity to power more than 4 million homes.

The Norfolk Vanguard West Offshore Wind Farm is subject to regulatory approvals and Vattenfall’s final investment decision.


The scope of work for Aker Solutions includes the engineering, procurement construction and installation (EPCI) of the high-voltage direct current (HVDC) offshore platform. The fabrication of the topside will be executed in a joint venture with Drydocks World Dubai, and the substructure will be fabricated at Aker Solutions’ yard in Verdal, Norway.

“The development of the entire Norfolk Offshore Wind Zone could ultimately require up to three HVDC platforms in succession, which would improve the long-term predictability and give positive repeat effects and standardization within the supplier industry,” says Sturla Magnus, executive vice president of new build at Aker Solutions.

Subscribe
Notify of
guest
0 Comments
newest
oldest most voted
Inline Feedbacks
View all comments